You don't have javascript enabled. Good luck with that.
Pencarian
Sepanjang 13,1 KM Jalan MHT Diperbaiki Tahun 2017

13.1 Kilometers of Jl. MHT in C. Jakarta will Be Repaired

Central Jakarta Bina Marga Sub-dept. budgeted Rp 19.3 billion to repair Jl. MTH along 13.1 square kilometers. Repair is focused on damaged road in residential area.

As contract, this residential road repair will be started in the end of the month

"As contract, this residential road repair will be started in the end of the month," said Aris Komaris Nandika, Head of Central Jakarta Bina Marga Sub-dept., Tuesday (3/14).

He added that road elevated location points are spread in Central Jakarta's eight sub-districts. In several points, are needed to elevate the road such as in Menteng Tenggulun area, Cikini Ampiun, and several points on Jl. MHT in Cempaka Putih.

Tanah Abang Sub-district Musrenbang Dominated by Roadwork Proposals

"For its execution, we must ensure the rainfall is low, if not, repair progress will not optimal," he closed.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1753 personFakhrizal Fakhri
  2. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1466 personFakhrizal Fakhri
  3. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye1066 personBudhi Firmansyah Surapati
  4. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1043 personFakhrizal Fakhri
  5. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye975 personNurito